Skip to content

Cementitious Screeds

Cementitious screeds are idea for areas which experience heavy footfall, as they are an extremely robust floor covering.

Cemfloor screeds are very responsive to underfloor heating; due to the fact that they can be laid in very thin sections and have a high thermal conductivity of up to 2.9w/mk.

Since Cemfloor is a cement based screed; floor coverings can be applied much faster than calcium sulphate screeds which need to be dried to a final moisture content of 0.5%CM which can delay floor finishings by months.

Cemfloor can be tiled at a final moisture content of 3.5%CM and timber floors can be installed at a final moisture content of 2.5%CM; speeding up the entire build process.

Compared with other liquid screeds which generally need to be force dried with underfloor heating; Cemfloor screeds can be used in non heated floors as it doesn’t require force drying to remove moisture. Using the correct tile adhesives; tiles can be placed in as little as 5 days in non- heated floors and after 16 days in heated floors once the heating has been commissioned.


Cemfloor Screed is designed for use as a bonded thick levelling screed on concrete, as a floating screed over thermal or acoustic insulation, or as an un bonded screed on top of a plastic membrane, It’s compatible with all types of floor coverings, cementitious adhesives, damp proof membranes and floor levellers.

Not sure which service will suit your project?  Just get in touch and we can design a bespoke package to suit your requirements